Compost plant Bad Dürkheim (Grünstadt)

Annual Throughput: 35.000 t/a

 

Wastes treated:

  • source separat. organic waste 35.000 t/a

 

 

Start-up of operation: 1992

DUERK1.JPG (56207 Byte)

shredding of overs

 

DYNA2A.JPG (29941 Byte)

  Aeration hall with turner

 

Process:

  • Feedstock preparation: bag-opening, screening 80 mm, manual sorting of overs, shredding with rotor shear
  • Ferrous separation
  • Homogenisation drum, 1 h retention time
  • 2 forced aerated bays 90  x 30 m
  • Full automatic turning technology
  • 8-week retention time process in fermentation hall
  • Compost refining unit
  • Odour treatment by biofilter

 